Pipe Rehabilitation

The rehabilitation of an aging infrastructure has become the focus of many older agencies. Triad Engineering has become very involved in this process. We have installed thousands of feet of different sliplining pipe products of up to 54" in both straight runs and curves. For this process, Triad has done its own cleaning, installation and grouting. We have operated in live sewage as well as bypass pumped conditions.

Rehabilitation also requires the management of connections into the new pipe system. Triad has used various creative methods to effectively connect sewers to the slipline pipe.

Shotcrete lining is also being used as a means of rehabilitation for old brick sewers.Triad is experienced with shotcrete and has performed shotcrete rehabilitation in old brick arches and sewers. We also are a certified installer of the Sekisui SPR spirally wound PVC liner. Both of these methods are used in older, non round or oval shaped sewers.

Click Here for a Printable Version of This Page (112kb PDF)

 

Contact Us

Ohio Office

9715 Clinton Road
Brooklyn, OH 44144
Phone: 440.786.1000
Fax: 216.651.0754

e-mail Triad Engineering

South Carolina Office

480 Jessen Lane, Unit H
Charleston, SC 29492
Phone: 843.416.1112
Fax: 843.416.1192