Triad-Engineering
Triad-Engineering

Pressure Piping

Since Triad's inception in 1987, thousands of feet of pressure piping have been installed successfully in a wide variety of environments. Pressure piping is used by many utility companies to carry water, waste, gas and special process fluids.

Triad has installed many miles of ductile iron, steel and pre-stressed concrete pipe - from small diameter distribution mains, along with hydrants and connections, to large transmission mains. Most of these projects have been installed in urban areas that demand careful execution and the ability to adapt to changing conditions.

Sewer force mains are becoming more popular as small sewage plants close due to EPA requirements. Force mains and package pump stations are being constructed to transport sewage to larger plants that meet EPA requirements. Gas lines have been installed for specific projects. Triad installed thousands of feet of steel and HDPE pipe. Our largest gas main project was 5000 feet long to a blast furnace location in Cleveland. Our largest pressure pipe project was three miles of 48” PCCP pipe in the City of Cleveland.

Click Here for a Printable Version of This Page (122kb PDF)

Contact Us

Ohio Office

9715 Clinton Road
Brooklyn, OH 44144
Phone: 440.786.1000
Fax: 216.651.0754

e-mail Triad Engineering

South Carolina Office

480 Jessen Lane, Unit H
Charleston, SC 29492
Phone: 843.416.1112
Fax: 843.416.1192